Skip to content

Power System Engineering

Electrical Safety Demands

Safety

We provide electric Installation & equipment services; Testing, Calibration, Inspection, Study & Analysis, Thermography, Certification, & 3rd Party Inspection.

DEWA

IEEE 1584

IEEE 242

IEEE 1547

NFPA 70E

IEC 61482

IEC 61936

IEC 60479

Abu Dhabi DoE

About

Engineered for the UAE.

Carelabs is a specialised electrical safety and power system engineering firm. We deliver DEWA-compliant studies, arc flash analysis, and protection coordination across the UAE.

Every study aligns to IEEE 1584, NFPA 70E, and IEC 60364 — backed by 15+ years of field-tested engineering across more than 1,000 projects.

Precision

Every calculation reviewed twice. Every drawing red-lined.

Compliance

DEWA, IEEE 1584, NFPA 70E — every report aligns to spec.

Delivery

Predictable timelines, agreed up front.

Partnership

Engineers stay engaged through commissioning and beyond.

Methodology

How We Work

A four-stage delivery process refined over a decade and a thousand engagements.

01

Discovery

Deep-dive into your electrical infrastructure and compliance posture.

02

Analysis

Arc flash, short circuit, load flow — the full IEEE 1584 study suite.

03

Reporting

Actionable documentation with risk scores, labels, and remediation steps.

04

Compliance

Full alignment with DEWA regulations and international standards.

Industries

Sectors We Serve

From hyperscale data centers to oil & gas terminals — every industry in the UAE has a different risk profile.

Oil & Gas·Manufacturing·Healthcare·Data Centers·Commercial·Hospitality·Oil & Gas·Manufacturing·Healthcare·Data Centers·Commercial·Hospitality·

FAQ

Common Questions

What is an arc flash study?

An arc flash study is an engineering analysis that evaluates the potential hazards from electrical arc flash events in your facility. It determines incident energy levels, establishes arc flash boundaries, and specifies appropriate PPE requirements per IEEE 1584 and NFPA 70E standards.

Is an arc flash study mandatory in the UAE?

While DEWA regulations require comprehensive electrical safety assessments, arc flash studies following IEEE 1584 are considered best practice for all commercial and industrial facilities in the UAE. Many insurers and facility operators require them as part of their safety compliance programs.

How long does a typical power system study take?

The timeline depends on facility size and complexity. A single arc flash study for a medium facility typically takes two to four weeks from data collection to final report delivery. Larger multi-building campuses or industrial complexes may require six to eight weeks.

What standards does Carelabs follow?

We follow IEEE 1584 for arc flash calculations, NFPA 70E for electrical safety in the workplace, IEC 61482 for protective clothing, IEC 60364 for electrical installations, and local DEWA regulations for UAE-specific compliance requirements.

Do you provide services across all Emirates?

Yes. Carelabs serves clients across Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah, and Umm Al Quwain. Our team operates throughout the UAE with project experience across all seven Emirates.

Get Started

Let's Talk.

Tell us about your project.