Power System Engineering
Safety
We provide electric Installation & equipment services; Testing, Calibration, Inspection, Study & Analysis, Thermography, Certification, & 3rd Party Inspection.
DEWA
IEEE 1584
IEEE 242
IEEE 1547
NFPA 70E
IEC 61482
IEC 61936
IEC 60479
Abu Dhabi DoE
Capabilities
Power system engineering, electrical safety studies, and DEWA-compliant testing across the UAE.
About
Carelabs is a specialised electrical safety and power system engineering firm. We deliver DEWA-compliant studies, arc flash analysis, and protection coordination across the UAE.
Every study aligns to IEEE 1584, NFPA 70E, and IEC 60364 — backed by 15+ years of field-tested engineering across more than 1,000 projects.
Every calculation reviewed twice. Every drawing red-lined.
DEWA, IEEE 1584, NFPA 70E — every report aligns to spec.
Predictable timelines, agreed up front.
Engineers stay engaged through commissioning and beyond.
Methodology
A four-stage delivery process refined over a decade and a thousand engagements.
Deep-dive into your electrical infrastructure and compliance posture.
Arc flash, short circuit, load flow — the full IEEE 1584 study suite.
Actionable documentation with risk scores, labels, and remediation steps.
Full alignment with DEWA regulations and international standards.
Industries
From hyperscale data centers to oil & gas terminals — every industry in the UAE has a different risk profile.
FAQ
An arc flash study is an engineering analysis that evaluates the potential hazards from electrical arc flash events in your facility. It determines incident energy levels, establishes arc flash boundaries, and specifies appropriate PPE requirements per IEEE 1584 and NFPA 70E standards.
While DEWA regulations require comprehensive electrical safety assessments, arc flash studies following IEEE 1584 are considered best practice for all commercial and industrial facilities in the UAE. Many insurers and facility operators require them as part of their safety compliance programs.
The timeline depends on facility size and complexity. A single arc flash study for a medium facility typically takes two to four weeks from data collection to final report delivery. Larger multi-building campuses or industrial complexes may require six to eight weeks.
We follow IEEE 1584 for arc flash calculations, NFPA 70E for electrical safety in the workplace, IEC 61482 for protective clothing, IEC 60364 for electrical installations, and local DEWA regulations for UAE-specific compliance requirements.
Yes. Carelabs serves clients across Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah, and Umm Al Quwain. Our team operates throughout the UAE with project experience across all seven Emirates.