Based on the Typical EHS Checklist for Operational Inspections following are the points that need to be fulfilled to obtain OFC.
You can enquire on any other activities that you need by emailing us on info@carelabz.com
The Process of Operation Fitness Certification (OFC) ensures that each company operating from any facility located/built on plot land/pre-built units within the jurisdiction areas of Jebel Ali Free Zone & Techno Park complies with all the requirements set forth by Environment, Health & Safety (EHS). OFC Inspection Request form shall require to be submitted prior to the start of any operations/activities carried out in a particular facility or pre-built unit/s (specifying the date of commencement of operations in the application form) not later than 7 days from the start of operation/s.
It is to be noted that EHS NOC shall be issued to facilities having only office facilities and not carrying out any operational activities and not having facilities for storage/warehousing and machine/equipment etc. and small retail outlets for example mobile phone shop, Tailoring shop and photo studio etc.
All companies operating from plot of land facility or pre-built warehouse units having Industrial, Trading, Commercial or Professional activities or operations which may also involves use of machine/ equipment &/or handling/processing/storage of the materials, waste generation within the areas governed by Jebel Ali Free Zone & Techno Park.
A separate OFC shall be issued for each facility to a company having more than one facility and located at different plot facility or pre-built warehouse unit (i.e. not adjacent and joined with each other), separated by any other facility/property not belongs to them or located across the road.
Wherever an existing company modifies/expand its facilities or adds/amend his activities/ operations in a particular plot/s, an existing OFC for a particular plot/s shall needs to be amended to reflect the modifications/changes/amendment. In the same regard, the OFC procedure as above shall be followed. This is applicable for sub-lessee and addition of any new materials storage also.
Based on the License expiry, the EHS OFC Admin shall automatically initiate the inspection schedule/renewal process for OFC on an annual basis within 60 days prior to expiry of the client License. No advance intimation to the client is given on the inspection visit to their facility. However, this doesn’t relieve the client’s responsibility to ensure that their OFC is renewed before the OFC/License expiry date. Any delays in renewal of the OFC may affect the renewal process of their License and Customs Import Code. Upon compliance with EHS requirements, the OFC with original approval (date) and current validity shall be issued to the client.